Page 492

Technical Dayta Sheet Compedium

CONTENTS CONCRETE REPAIR CORROSION CONTROL GROUTS & ANCHORS PROTECTIVE COATINGS INDUSTRIAL FLOORING SURFACE TREATMENTS JOINT SEALANTS CONCRETE JOINTING ROOFING WATERSTOPS WATERPROOFING JOINT FILLERS TIMBER FLOORING ALPHABETICAL Important notice A Safety Data Sheet (SDS) and Technical Data Sheet (TDS) are available from the Parchem website or upon request from the nearest Parchem sales office. Read the SDS and TDS carefully prior to use as application or performance data may change from time to time. In emergency, contact any Poisons Information Centre (phone 13 11 26 within Australia) or a doctor for advice. Product disclaimer This Technical Data Sheet (TDS) summarises our best knowledge of the product, including how to use and apply the product based on the information available at the time. You should read this TDS carefully and consider the information in the context of how the product will be used, including in conjunction with any other product and the type of surfaces to, and the manner in which, the product will be applied. Our responsibility for products sold is subject to our standard terms and conditions of sale. Parchem does not accept any liability either directly or indirectly for any losses suffered in connection with the use or application of the product whether or not in accordance with any advice, specification, recommendation or information given by it. INDEX 480 Page 2 Parchem Construction Supplies Pty Ltd 7 Lucca Road, Wyong NSW 2259 Phone: 1300 737 787 www.parchem.com.au ABN 80 069 961 968 Distributed in New Zealand by: Concrete Plus Ltd 23 Watts Rd, Sockburn 8042 Ph: 03 343 0090 Application Instructions Surface preparation All surfaces to which Argo P is to be applied must be smooth, free from contaminants and loose material. Rough concrete must be ‘faired up’ before commencing application. Contact Parchem for suitable fairing products. Priming Index Bitumen Primer is normally applied to all concrete and masonry substrates. Index Bitumen Primer should be applied at a rate of approximately 0.13 L/m2 to surfaces which Argo P will be applied. Coverage rate for primer will vary depending on porosity of surface being treated. Allow the primer to dry for at least 1 hour at temperatures 25°C and above, until the primed surface is tack free. At lower temperatures allow additional drying time to ensure a tack free surface. Priming should only be carried out on surfaces that will be covered with the membrane on the same day. Application Planning the installation of the membrane is important to ensure joins occur in suitable locations. Argo P membrane must be laid to allow side laps of 100 mm and end laps of 150 mm. If membrane is to be spot bonded, full bonding must occur for 1 m each side of end laps. Application of membrane is by torch bonding using a suitable gas torch. The membrane is applied with surface protected by the Flamina facing down towards substrate, during the application of the gas flame the Flamina will melt away. Bonding is achieved by slowly unrolling the membrane whilst directing flame at the underside of roll and melting the bitumen by moving the torch from left to right. Side laps must be welded with care. Correct welding will show a 4 - 8 mm wide continuous bead of bitumen along the lap. Side laps should be 100 mm wide. Attention should be given to end laps ensuring complete adhesion allowing 150 mm overlaps. On completion of the membrane installation all exposed perimeter edges must be mechanically fixed or terminated under a flashing. Protection Whilst the Argo P membrane is based on an APP modified bitumen which is resistant to UV, it is not recommended for long-term exposure without some form of protective topping medium. Fidia Mineral or Testudo Mineral should be used as a cap or weathering sheet for use in non-traffic / maintenance traffic areas. Where the membrane is to be back filled, such as with basement applications, the Argo P should be protected from mechanical damage with the Emer-Proof Drain V drainage/ protection system also available from Parchem. Limitations New concrete substrates should be allowed to cure for a minimum of 28 days prior to the installation. Supply Argo P: 1 m wide rolls, 10 m long Product Code: 742230 Index Bitumen Primer: Product Code: 8 m² per litre 742105 Emer-Proof Drain V: Product Code: 2m x 20m roll (40m²) 743072 Note: no allowance has been made for wastage. Storage Store in cool, dry conditions ie. not exceeding 25°C. Rolls must be stored on end and must NOT be stored lying down. Index® Argo P


Technical Dayta Sheet Compedium
To see the actual publication please follow the link above