Page 461

Technical Dayta Sheet Compedium

CONTENTS CONCRETE REPAIR CORROSION CONTROL GROUTS & ANCHORS PROTECTIVE COATINGS INDUSTRIAL FLOORING SURFACE TREATMENTS JOINT SEALANTS CONCRETE JOINTING JOINT FILLERS WATERPROOFING WATERSTOPS ROOFING TIMBER FLOORING ALPHABETICAL INDEX Mixing Emer-Proof EcoSeal membrane should be lightly stirred before use. It can be applied to both vertical and horizontal surfaces using a roller or brush. Membrane application Ensure the surface has been appropriately prepared in accordance with Parchem’s instructions. Install Emer-Proof Elastic Joint Band tape / corners and accessories (as per separate Emer-Proof Elastic Joint Band system Technical Data Sheet). Apply the first coat of Emer-Proof EcoSeal to the primed surface using a thick brush or roller. After waiting the required 2 to 4 hours (@23°C) re-coat time, re-apply a second coat of Emer-Proof EcoSeal at 90o to the first coat, ensuring complete coverage is achieved and no air bubbles exist. A third coat may be required if imperfections are present in the membrane. Conduct a final inspection on the surface of the membrane prior to commencing tiling to ensure no pin holes exist. Once the waterproofing is completed, do not disturb the area for at least 24 hours. Tiling can commence approximately 24 hours after last coat, in which case Emer-Proof Tilebond Flex tile adhesive should be used. Maintenance No special requirements, any damage identified during normal inspections should be repaired or replaced as appropriate. Limitations Emer-Proof EcoSeal is UV resistant but is not designed for use as a long term exposed membrane, stand alone product. However, over coating Emer-Proof EcoSeal with Emer-Proof Top Coat will not only protect the base membrane from UV degradation but will also provide a foot trafficable membrane system (please refer to Emer-Proof Top Coat TDS). Drying times Recoat: 2-4 hour Dry film: 8-12 hours Tiling/toppings: 24 hours based on normal ambient conditions of 23°C Flood testing: 24 hours All drying times quoted are @ 23°C/50% RH Allow a further minimum 24 hours of drying time @ 10°C Please Note: Application of all liquid applied membranes and primers should always refer to the surface temperature conditions before commencing and not just ambient temperatures. (There are limitations to how hot/cold the surface temperature can be, when applying a liquid based membrane or primer). For example: ambient temperatures may be 10°C but the substrate could be 0°C and have frost issues. The same applies with higher temperatures: ambient temperature may be 26°C but have a substrate temperature of 36°C Emer-Proof Tile Bond Flex polymer modified cement based tile adhesive is recommended for direct adhesion to the membrane. Emer-Proof Multi-Purpose Primer and Additive is recommended within screeds and renders directly over the membrane as a waterproof and adhesion enhancer. Cleaning Product while in a wet state will clean up with water. Once dried, product will need to be removed by Solvent 10 or by mechanical means. Splashes of Emer-Proof water based membrane on paintwork etc. should be wiped off immediately using a cloth dampened with a strong detergent solution. Brushes and brooms etc. should be soaked in a strong detergent solution immediately after application has finished. Hands and skin may be cleaned using a proprietary waterless hand cleaner, but prevention of soiling is a better practice by wearing gloves and overalls. Page 3 449 Emer-Proof® EcoSeal


Technical Dayta Sheet Compedium
To see the actual publication please follow the link above