Page 553

32857 Parchem Technical Data Compendium 2015_Crop4emag.pdf

CONTENTS CONCRETE REPAIR CORROSION CONTROL GROUTS & ANCHORS PROTECTIVE COATINGS INDUSTRIAL FLOORING SURFACE TREATMENTS JOINT SEALANTS CONCRETE JOINTING JOINT FILLERS WATERPROOFING WATERSTOPS ROOFING TIMBER FLOORING ALPHABETICAL INDEX 541 Emer-Proof® Drain V Application Instructions Laying instructions Emer-Proof Drain V is laid after having positioned a uniform and complete bituminous waterproofing layer on the foundation wall. Unroll Emer-Proof Drain V along the same wall, making sure that the fabric side of the membrane faces the ground, up to the foundation foot, and leaving at least 40 cm of Emer-Proof Drain V beyond the same foot. Lay a bed of draining material on the foundation surface in support of the water discharge pipe, positioning it on top of the final portion of the Emer-Proof Drain V. Fix the top portion of the membrane using the nails supplied with the same membrane at an interval of 50 cm at the most. Then position the plastic closing profile at the top of the membrane, fastening it to the reinforced concrete wall using steel nails. Continue along all the foundation walls. After that, fix the Emer-Proof Drain V using the relevant fixing kit (plastic plugs with washer) after having drilled holes in the wall, creating an anchoring mesh of 1x1 m, also including the vertical overlappings that must be at least 20 cm wide. For improved protection, position a bituminous adhesive strip (Emer-Proof HDPE) between the two overlapping edges of the Emer-Proof Drain V. After completing the fixing operations, proceed with the backfill, being careful to carry it out in uniform layers. Estimating Supply Emer-Proof Drain V: 2 x 20 m roll Coverage Emer-Proof Drain V: 40 m² per roll


32857 Parchem Technical Data Compendium 2015_Crop4emag.pdf
To see the actual publication please follow the link above