Page 482

32857 Parchem Technical Data Compendium 2015_Crop4emag.pdf

CONTENTS CONCRETE REPAIR CORROSION CONTROL GROUTS & ANCHORS PROTECTIVE COATINGS INDUSTRIAL FLOORING SURFACE TREATMENTS JOINT SEALANTS CONCRETE JOINTING ROOFING WATERSTOPS WATERPROOFING JOINT FILLERS TIMBER FLOORING ALPHABETICAL Drying times Tack free – 15 minutes (will vary with surface porosity). Dry film – 30 minutes. Based on normal ambient conditions of 23°C. As a minimum, double the drying time of primer if applied @ 10°C – do not apply membrane coatings until primer has completely dried. Please Note: Application of all liquid applied membranes and primers should always refer to the surface temperature conditions before commencing and not just ambient temperatures. (There are limitations to how hot/cold the surface temperature can be, when applying liquid based membrane or primer). For example: ambient temperatures may be 10°C but the substrate could be 0°C and have frost issues. The same applies with higher temperatures: ambient temperature may be 26°C but have a substrate temperature of 36°C INDEX 470 Supply 743124 Emer-Proof Non-Porous Primer – 1L Pail (1L/10m²) 743123 Emer-Proof Non-Porous Primer – 4L Pail (1L/10m²) Shelf Life 12 months if kept in a cool, dry store. Storage Condidtions Store in dry conditions at temperatures between 5°C and 30°C in the original, unopened containers. If stored at high temperatures, the shelf life may be reduced. Emer-Proof® Non Porous Primer


32857 Parchem Technical Data Compendium 2015_Crop4emag.pdf
To see the actual publication please follow the link above