Page 470

32857 Parchem Technical Data Compendium 2015_Crop4emag.pdf

CONTENTS CONCRETE REPAIR CORROSION CONTROL GROUTS & ANCHORS PROTECTIVE COATINGS INDUSTRIAL FLOORING SURFACE TREATMENTS JOINT SEALANTS CONCRETE JOINTING ROOFING WATERSTOPS WATERPROOFING JOINT FILLERS TIMBER FLOORING ALPHABETICAL the product is used, as it cannot be stored. Emer-Proof Ecoflex is normally totally dry in 24 hours at 25°C /50% RH but can take up to 72 hours at 10oC/ 50% RH. Drying times will vary depending on temperature, humidity, condition and porosity of substrate. Protection Where the membrane is to be back filled, such as with basement applications, Emer-Proof Ecoflex should be protected from mechanical damage with Impraboard or Emer-Proof Drain V drainage/protection system also available from Parchem. Cleaning Splashes of Emer-Proof water-based membrane on paintwork etc. should be wiped off immediately using a cloth dampened with water and a strong detergent solution. Brushes and brooms etc. should be soaked in a strong detergent solution immediately after application has finished. Hands and skin may be cleaned using a proprietary waterless hand cleaner, but prevention of soiling is better practice by wearing gloves and overalls. Where Emer-Proof Ecoflex has been allowed to dry on equipment or surfaces it may be removed using either Solvent 10 or mechanical means. Maintenance No special requirements, any damage identified during normal inspections should be repaired or replaced as appropriate. Limitations Emer-Proof Ecoflex is not recommended for continuous water immersion or as a membrane on internal walls subject to back pressure. Emer-Proof Ecoflex has not been designed as an exposed wearing course membrane. Emer-Proof Ecoflex must be covered and cannot be exposed to UV on a permanent basis. Not designed to be finished directly over with tiles, screeds, renders or paints. Drying Times Recoat: 4 hours Dry film: 24 hours Backfilling, covering over: 4 days. Ensure surface is cured before back filling Based on normal ambient conditions of 23°C @ 50% RH Drying times @ 10°C – allow a ‘minimum’ 24 hours extra drying time on standard recommendations at this temperature. INDEX 458 Please Note: Application of all liquid applied membranes and primers should always refer to the surface temperature conditions before commencing and not just ambient temperatures. (There are limitations to how hot/cold the surface temperature can be, when applying liquid based membrane or primer). For example: ambient temperatures may be 10°C but the substrate could be 0°C and have frost issues. The same applies with higher temperatures: ambient temperature may be 26°C but have a substrate temperature of 36°C. Supply 730730 Emer-Proof Ecoflex – 20L Pail (2L/m² total) 743124 Emer-Proof Non-Porous Primer – 1L Pail (1L/10m²) 743123 Emer-Proof Non-Porous Primer – 4L Pail (1L/10m²) 743121 Emer-Proof Multi-Purpose Primer and Additive 4L Pail (1L/6-8m²) 743120 Emer-Proof Multi-Purpose Primer and Additive 15 L Pail (1L/6-8m²) 743265 Emer-Proof Elastic Joint Band Tape 120mm W x 50M Roll 743270 Emer-Proof Elastic Joint Band Corner Internal 90° 135mm x 135mm – Each or 50/Box 743275 Emer-Proof Elastic Joint Band Corner External 270° 135mm x 135mm – Each or 50/Box 743125 Emer-Proof Elastic Joint Band Corner Adjustable Internal – 135mm x 135mm – Each or 50/Box 743126 Emer-Proof Pipe Detailing Square Small Each or 50/Box 743127 Emer-Proof Pipe Detailing Square Medium Each or 50/Box 743128 Emer-Proof Pipe Detailing Square Large Each or 50/Box 743129 Emer-Proof Butyl Square Floor Waste Detailing Collar – Each or 25/Box 405015 Emer-Proof Aquabarrier (Grey) – 20L Two Part Kit (1L/1.5m² per coat) Shelf Life 12 months if kept in a cool, dry store. Storage Conditions Store in dry conditions at temperatures between 5°C and 30°C in the original, unopened containers. If stored at high temperatures, the shelf life may be reduced. Emer-Proof®(FRÀH


32857 Parchem Technical Data Compendium 2015_Crop4emag.pdf
To see the actual publication please follow the link above