Page 402

32857 Parchem Technical Data Compendium 2015_Crop4emag.pdf

CONTENTS CONCRETE REPAIR CORROSION CONTROL GROUTS & ANCHORS PROTECTIVE COATINGS INDUSTRIAL FLOORING SURFACE TREATMENTS JOINT SEALANTS CONCRETE JOINTING ROOFING WATERSTOPS WATERPROOFING JOINT FILLERS TIMBER FLOORING ALPHABETICAL Placement of the Conwrap strip Remove release paper at the start of the roll. Place the strip in position at the crack or joint and unroll removing the release paper at the same time. Press the strip on to the concrete to form the shape of the surface and to remove any air pockets. All strips should be rolled firmly into place. Overlaps should be a minimum 50 mm. Protection before backfilling Conwrap is not suitable for long term exposure to UV. The membrane should therefore be protected in some way within 3 months of application. When the membrane is to be backfilled such as with culvert applications, Conwrap should be protected from physical damage by using Impraboard, also available from Parchem. INDEX 390 Estimating Supply Conwrap: 150 mm wide, 20 m long roll (other sizes made to order) Emer-Proof Self Adhesive Primer: 4 litre and 20 litre pail Coverage Emer-Proof Self Adhesive Primer: Appox. 6 m²/litre Note: no allowance has been made for wastage. Storage 12 months in original containers stored in cool, dry conditions i.e. not exceeding 25°C. Storage above this temperature may reduce storage life. Conwrap


32857 Parchem Technical Data Compendium 2015_Crop4emag.pdf
To see the actual publication please follow the link above