Page 310

32857 Parchem Technical Data Compendium 2015_Crop4emag.pdf

CONTENTS CONCRETE REPAIR CORROSION CONTROL GROUTS & ANCHORS PROTECTIVE COATINGS INDUSTRIAL FLOORING SURFACE TREATMENTS JOINT SEALANTS CONCRETE JOINTING ROOFING WATERSTOPS WATERPROOFING JOINT FILLERS TIMBER FLOORING ALPHABETICAL 'XUDÀRRU® HD-S System Apply first coat at approximately 30 - 40 m²/litre. Increase coverage rate on highly polished floors. Allow to dry for at least 30 minutes and apply subsequent coats at the same application rate allowing each coat to completely dry. Apply a minimum of two coats of Durafloor HD-S. Allow Durafloor HD-S one hour to dry after final coat, prior to foot traffic. Durafloor HD-S System must be free from contact with water for at least 72 hours in ambient temperature to allow cure time. Humidity will delay cure time, therefore humidity should be reduced by using a fan etc. After 72 hours, the surface treated can be damp mopped or scrubbed with an auto scrubber and neutral cleaner. Periodic Maintenance Surface should be regularly cleaned with a neutral cleaner to achieve optimum performance and longevity. Mixing Material should be well agitated. Cleaning Clean all equipment with soap and warm water. Coverage Apply Durafloor HD at approximately 7 - 10 m²/litre depending on surface porosity. Apply Durafloor HD-S at approximately 30 - 40 m²/litre depending on surface porosity and sheen. Limitations „ Durafloor HD will not penetrate curing compounds or INDEX 298 other coatings on the concrete being treated. These must be removed by mechanical means such as diamond grinding. „ Coverage and consumption rates will vary depending on porosity and roughness of concrete being treated. „ Stain resistance and sheen level will vary depending on porosity and roughness of concrete being treated. „ Liquid hardeners / densifiers work by reacting with Calcium Hydroxide available in the concrete. If the concrete had been rain affected or overworked in the laying process there may not be sufficient Calcium Hydroxide present for the reaction to occur. These products will not fix bad concrete. „ The final grind may affect the overall characteristics of the floor. It is recommended to carry out grinding and slip trials on projects where slip may be of concern. „ Material cannot be applied in below freezing temperatures. „ Adverse weather conditions or humidity may affect cure time and application rates. Parchem recommends discussing application directly with our Technical Department. Supply 505002 - Durafloor HD: 5 L 505001 - Durafloor HD: 20 L 505505 - Durafloor HD: 200 L 505004 - Durafloor HD-S: 5 L 505003 - Durafloor HD-S: 20 L Specification Clause Refer to Parchem website for detailed specification clauses. Storage Do not allow to freeze. Keep container closed when not in use. Do not transfer material into other containers for storage or disposal. Shelf life All products have a shelf life of 12 months if kept in a dry store in the original, unopened packs.


32857 Parchem Technical Data Compendium 2015_Crop4emag.pdf
To see the actual publication please follow the link above